top of page
Dog Training Leash Long Lead with Padded Foam Handle Nylon
SKU 1005005753696319
Price
$50.75
This long dog training leash features a padded foam handle and is made from durable nylon, suitable for all dog sizes and training activities.
- Material: Nylon climbing rope, 3/8 inch thick
- Padded double-layer foam handle to protect from rope burn
- 360° swivel metal hook with rust prevention
- Available in lengths: 3m, 5m, and 15m
- Waterproof and floatable, does not absorb water
- Non-absorbent material that floats when submerged
- Suitable for small, medium, large, and heavy-duty dogs
- Multi-purpose use: training, walking, hiking, swimming, camping, and more
Quantity
bottom of page



















